DRAFT ESTIMATE - SUBJECT TO FURTHER UPDATE - FIGURES ESTIMATED BY FCI CONTRACTORS INC.

Project Amount
Repairs to irrigation / tennis area
Irrigation system - complete replacement $125,000
Drainage system & revegetation around upper tennis court wall $30,000
Tennis concrete wall - major repairs $70,000
Tennis courts - resurface/paint  $43,000
Landscaping replacement between volleyball and tennis courts  $20,000
New benches outside of tennis courts  $6,000
 Windscreens - replace (tennis)  $28,000
  
Playground updates
Play equipment - replacement of original / not to code equipment $140,000
Groundcover - refill  $11,000
Gazebo picnic configurations, new gates at courts  $35,000
Park furnishings (picnic tables) - replace  $30,000
  
Safety & security enhancements
Updated building and pool perimeter security systems; cameras and alarm system  $28,000
Tennis court electric lock system with keycards  $7,500
Pole lights - replace (pool and parking)  $27,000
Sailfish room doors - partial replacement with electric keycode lock  $8,500
Main entrance doors - partial replacement and add electric keycode lock  $11,000
Concrete flatwork in locker rooms (fix unsafe water collection in middle of women's toilet/shower area)  $34,000
 
Updates to pool deck area
Add shade around pool (Tucci umbrella system)  $36,000
Pool furniture - replace and upgrades of all lounge chairs, tables, regular chairs $75,000
Misc. pool equipment - replace vacuums, lane ropes and spindles, fixtures, benches  $13,000
Add bottle filler (replace drinking fountain)  $6,500
Safety fence reconfiguration at kids pool; add picnic table  $15,000
Lifeguard stands - replace  $25,000
Pool restrooms - toilet, drainage and fixture upgrades (only to failing items)  $60,000
Pool filter media - replace  $11,000
  
Cabana area updates
Fixtures under cabana - ceiling fans and/or misters; paint or replace picnic tables  $30,000
Audio/video equipment for pool deck: loudspeaker; outdoor entrance posting station; movie screening equipment and overhead projector $17,000
New gas barbecues upgrade $5,000
  
Sailfish Room (areas not covered in recent HOA furniture project)
Restrooms in hallway to guard stand - toilets, tiling and sink upgrades  $25,000
Appliances - replace (fridge and stove)  $6,500
Cabinets/countertop - replace  $10,000
  
Volleyball court rehab
Sod cutting and new boundary materials, sand, net, poles  $20,000
Foot cleaning station at pool (prevents sand from clogging pool systems)  $5,000
  
Exterior repairs/replacements
Replace gutters/downspouts  $7,500
Building exterior surfaces - repaint (building, pavillion, park)  $50,000
Iron fencing - repaint  $7,500
Wood fencing - restain  $2,500
Ironwork fencing at NW Entrance - replace fabric and metalwork where needed, reconfigure playground entrance during summer/fall to accommodate walkthrough to pool and better tennis access  $64,000
Groundcover - replenish and replacements along right of way and parking lot  $25,000
Trees - replacement throughout facilities  $5,500
  
New features - feasibility studies will determine whether we proceed
Parking lot - major overlay and change travel direction to improve safety (will require GV approval)  $75,000
Multipurpose sport court near the playground area - feasibility study first  $50,000
  
Bond issuance and planning/construction fees 
Bond issuance  $250,000
Construction overhead and project bidding and management  $349,000
Architecture and Engineering  $200,000
  
Contingency - only used if needed to complete scope or fix unexpected issues
Contingency for unexpected / unanticipated projects, construction, and/or material/labor costs and expenses increasing from time of original estimate (to prevent shortfall as happened in 2020 project) $900,000
TOTAL $3,000,000